| Tuxpan II – 495 MW .Combined Cycle Power Plant
|
|
|
| Owner: |
Electricidad Aguila de Altamira S. de R.L. de C.V. |
| Engineer: |
Mitsubishi Heavy Industries, Nagasaki, Japan |
| Application: |
High pressure boiler feed water production |
| Equipment: |
Media filtration, two-stage RO (SWRO/BWRO),
mixed bed DI, decarbonator |
| Start Up Date: |
December 2001 |
Operating Data:
- Feedwater TDS: 35,000 mg/L
- RO Permeate: < 250 mg/L TDS
- Demineralized Water: 16?O-cm
Scope of Work/Supply:
- Design, fabricate, supply, supervision of installation
and commissioning
|
|
|
|
|
| American Engineering Services, Inc. is fully committed to improving water quality through innovative technologies, to meet or exceed customer requirements, extending beyond geographical and cultural boundaries.