| Altamira II – 495 MW .Combined Cycle Power Plant |
|
“The Altamira Combined Cycle Power Plant for an IPP, was delivered on schedule and achieved better performance than the guaranteed value among the application of ‘F Generation’ Gas Turbines. The addition of this highly successful full turnkey plant project, featuring the technologically complex F Generation Gas Turbine, is truly a new milestone demonstrating the high potential for future activities in this country.”
|
| Owner: |
Electricidad Aguila de Altamira S. de R.L. de C.V. |
| Engineer: |
Mitsubishi Heavy Industries, Nagasaki, Japan |
| Application: |
Treatment of river water to produce boiler feed water |
| Equipment: |
Clarifier, RO, mixed bed DI, oil-water separator,
decarbonator, filter belt press
|
| Start Up Date: |
May 2002 |
Operating Data:
- Demineralized Water: 16?O-cm
- Clarifier Feed Flow: 2,667 gpm
- Feedwater TDS: 838 mg/L
- RO Permeate: 5 mg/L TDS
Scope of Work/Supply:
- Design, fabricate, supply, supervision of
installation and commissioning
|
|
|
|
|